Heat & process heat
In the renovation of existing heating systems are great
potentials. We analyze your system in
detail and develop measures and
concepts for optimization of the components and
the total system:
- Boiler exchange or efficiency increase
- Improvement of heat distribution and plant
hydraulics
- Use of highly efficient heat emission systems
- Activation so far unused waste heat
potentials by heat recovery
- Reduction of electricity consumption of
pump
|
Combined heat and power
Since the amendment of combined heat and power
law from 1.1.2009 the profitability of combined
heat and power -systems is clearly improved. Operators of
heating systems are able to increase their system
efficiency and reach significant reduce of costs.
We guide you from Project conception till final
acceptance:
- Capture of thermotechnical basic data
- Cost- and profitability calculation
- Dimensioning of system components
- Hydraulics engineering concept
- Assignment and construction monitoring
|